Boilerhouse and trenching

Woolhope Woodheat director Gareth Williams made a flying visit with Sharenergy staff last week to have a look at progress on site. Since then equipment has been arriving in the boilerhouse preparatory to plumbing and wiring.

This entry was posted in Info. Bookmark the permalink.